PP plastic thread water supply pipe fitting mould
We are a professional manufacturer specialized in designing, manufacturing moulds in China. With 29 years working experience in the mould and molding injection.
1.material:45#,P20,718..
2.Cavity:Single/multiple
3.Runner:Hot/cold
4.Design software:UG, PROE, CAD, CAXA etc.
Step
1.R&D |
We support your R&D. Make the files or improve the design if you needed. |
↓ |
|
2.Negotiation |
the quality, price, material, delivery time, payment , ect. |
↓ |
|
3.Place an order |
according your own design or you choose our design. |
↓ |
|
4. Mould |
According customers request to build the mould. Before make the mould, we send mould design to customer approval first before production; we send samples to customer to confirm first. |
↓ |
|
5. Sample shoot |
If the first sample come out is not satisfied customer, we modify the mould and until meet customers satisfactory. |
↓ |
|
6.Products in store |
If your quantity is beyond our storage, we will provide lead time to you. |
↓ |
|
7. Delivery |
Delivery goods by sea or by air, according customers requirement. |
Q: What kind of mould can you make?
A: We can make all kinds of plastic injection moulds and blow moulds.
And we are professional manufacturer for making pipe fitting moulds .
Q:How long of your mould delivery time?
A: It takes 60-90 days to have the mould manufactured depending on the mould structure and the number of cavity (single or multi) after you approved our mould drawing. The delivery time should be calculated from the date you approved our mould drawing. We can ship your plastic moulds with 1 week after you confirmed our final samples.
Hot Tags: pp plastic threaded water supply pipe fitting mould, China, manufacturers, factory, Huangyan, PP Collapsible Socket Fitting Mould, PPR Reducing Tee Pipe Fitting Mould, CPVC Plastic Elbow 90 Fitting Mould, PPR Elbow 45 Pipe Fitting Mould, PVC Elbow 90 Pipe Fitting Mould, PPR Y-tee Pipe Fitting Mould